SUB-STATIONS
Centaur has an experience in substation projects, from Design, Supply, Installation and Testing & Commissioning of Substation upto 400 kV, to the selection of equipment required to meet the demands of the highly sensitive link in the power network.
DESIGN
Our In-house design team, backed by vast experience and knowledge gained throughout the years, has equipped the company with the capability to executes complete design of Substation from 33kV upto 400kV, which includes
- Detailed feasibility study
- Engineering plan
- Civil and structural design which includes:
- Pile design
- Foundations
- Steel structures
- Control house
- Electrical layout design which includes:
- Positioning of equipment
- Bus design
- Design of manhole and conduit system
- Design of auxiliary A.C. power system
- Selection of D.C. batteries and battery chargers
- Layout of control house
- Grounding and lightning protection design
- Relay protection, SCADA Control design which includes:
- Relay protection and instrumentation system schematics and wiring diagrams
- Relay racks or panels
- Remote control and metering (SCADA – system control and data acquisition
ASSETS
Because selection of the major equipment is one of the most critical tasks in substation engineering, there are a lot of details. These are just the part of some major equipment ratings, the latest equipment’s used in this field are possessed by Centaur
- Power transformer
- Circuit breaker
- Current transformer (CT)
- Voltage transformer (VT)
- Disconnect switch
MANPOWER & CERTIFICATION
Full-fledged in-house facility with competent Project Managers of 25 plus years of experience, Construction Managers , Site Managers with 10 to 20 years of experience, Certified and Approved Project Engineer, Site Engineer, Supervisor, Foreman, Charge hand and Labors.
Our engineers have proven their skills and capabilities successfully by executing innumerable important power substation projects undertaken all over the UAE. Each site have approved safety officers to ensure safety on site as per UAE safety protocols.
PROCESS
Building a new substation or retrofitting the old one is a complex process full of design and engineering tasks to be worked on. The main steps in substation design and engineering are as follows:
- Switching system
Selection of a substation switching system: ring bus, breaker-and-a-half, etc. based on reliability requirements.
- Key plan and location of components
Preparation of a key plan which should show the location of all components of a substation and their interconnections, as well as steel structures, control house, fire walls, driveways, fence and property line.
- Equipment selection and ordering
Selection and ordering of equipment, which is usually done in a utility company by a designated group of equipment experts.
- Engineering support
Engineering support for NOC, licensing and approvals which includes preparation of necessary drawings sealed by professional engineers, testifying at dubai municipalities where a new substation is planned to be built and selecting means of noise mitigation if needed.
- Construction support which includes a resolution of technical problems discovered during construction, ordering of additional materials, etc.
CONTRACTING SERVICES
General contracting, often referred to as a traditional delivery system, allows the owner to engage with the architect/engineer to prepare the design of the entire project. Upon design completion, the project scope is competitively bid to a construction firm for a fixed lump sum.
Our responsibilities when serving as the General Contractor include:
- Providing all materials, labor, equipment and services.
- Subcontracting with various trade and specialty contractors
- Applying or assisting in the application process for permits
- Monitoring schedule and cash flow
- Maintaining accurate records
- Ensuring a safe and secure project site