HORIZONTAL DIRECTIONAL DRILLING
Horizontal Directional Drilling or HDD is a controllable trenchless method of laying underground pipelines like water, sewer, drainage, oil, gas, cables under road, bridges, landscape, river, metro etc. based on using special drilling machines. This installation technique has proved to be extremely friendly towards the environment, with only minor ecological interventions. HDD technology is particularly appealing construction options in urbanized area with numerous existing underground utilities, heavy traffic..
ASSETS
To meet the growing stringent demands of HDD, the latest machinery and equipment used in this field are possessed by Centaur, Some of them are as follows:
- D40x55DR S3 Navigator Horizontal Directional Drilling Machine
- MX 240 Mud mixing system
- Falcon F5 Directional drilling Guidance System
- HDPE Butt Fusion Welding Machine
- Bentonite Removal Tanker
- 10000Gal Water Tanker
- Back Hoe Loader
- Chain Excavator
- Wheel Excavator
- Skid Loader
- Low Bed
- 10TON HIAB
MANPOWER & CERTIFICATION
Full-fledged in-house facility with certified & competent Project Managers, Site Engineer, Safety Officer, HDD manager, Tool Finder (Locater), Driller and Labors. Roles & responsibility are as follows:
HDD MANAGER
- Managing the complete fleet of HDD Units and Crew.
- Design, planning and supervision for HDD drawings and as-built
TOOL FINDER (LOCATOR)
- Locates the Pilot Head according to the drill path for Horizontal Directional Drilling Rig
- Prepares sketches for field notes in construction layouts and as-built
- Calibrates and maintains transmitter
- Identifies the bore length and instruct / supervise the product pipe /duct team in preparation and arrangements
- Coordinates with suppliers for consumables required at site
- Overall supervision of the Horizontal Directional Drilling activities.
PROCESS
Horizontal Directional Drilling works on a Turnkey basis, including the following in accordance with Local Authority/Client’s requirements:
- Obtaining trial pit NOC from all concerned authorities and consultants.
- Trial pit excavation works to locate all services within the vicinity of the drilling location.
- Soil investigation at the drilling location & preparation of drilling profile.
- Method statement & bentonite slurry mixing procedure
- Traffic diversion / control arrangement with the approval of RTA
- Pre-drive road levels prior to carrying out directional drilling works.
- Preparation of drive and receiving pits.
- Dewatering works.
- Supply & welding of HDPE pipes.
- Directional drilling works as per the approved drilling profile drawings.
- Filling of bentonite & disposal of excess bentonite drilling fluid to authorized locations
- Post-drive road levels after carrying out directional drilling works.